420 Energy Storage Projects

Posted on Leave a commentPosted in energy storage, energy storage database, Gills Onions, obama stimulus, vandium flow battery

The government has done something right!  In contrast to the Obamacare website debacle, the DOE has provided a website that provides extensive and useful information on large scale electric storage projects. The recent press release states, ” The Energy Storage Database lists 420 energy storage projects from 34 countries with a combined 123GW of installed […]

Rebates Extended for Energy Storage in California

Posted on Leave a commentPosted in CPUC, demand response SGIP, energy storage, Prudent Energy, renewable energy, wind energy

Today, Jerry Brown, Governor of California, will sign AB 1150 into law.  This bill increases the funds available for the Self Generation Incentive Program (SGIP) rebates.  These rebates have helped fund distributed storage projects in California and have been extended to include Energy Storage.  After many delays and changes in the SGIP program, these additional […]

CPUC Revamp Trying to Kill Advanced Energy Storage?

Posted on Leave a commentPosted in CPUC, demand response SGIP, energy storage, VRB-ESS

The California Public Utility Commission (CPUC) is revamping the rules for the Self Generation Incentive Program (SGIP) with a major, and completely inappropriate, performance requirement for Advanced Energy Storage. The SGIP provides rebates for various on-site distributed energy resources (DER).  Energy Storage was added to the list of DER’s several years ago after much work by VRB […]

Emission Off-Sets or Energy Storage?

Posted on 1 CommentPosted in energy storage, flow battery, Prudent Energy, vanadium redox, VRB-ESS

The California Public Utilities Commission (CPUC) is currently dealing with the problem of disappearing electric generation in the Southern California area. Due to environmental concerns – emissions and water – many older fossil fueled plants are being retired,and it’s not possible to permit new plants. 12,000 MW of capacity is at risk and system reliability […]